ADU electrical contractor in Livermore, CA
Home / Services / ADU Electrical

ADU Electrical Contractor in Livermore, CA

An ADU is a whole second home's worth of electrical, and most Livermore panels were never sized for it. Get the load wrong and the permit stalls, the inspector red-tags the job, or the breakers start tripping once someone moves in. We size, wire, and permit ADU electrical so it passes the first time and runs clean for good. Licensed, family-owned, and local to the Tri-Valley.

CA Licensed #1097977Family-OwnedPermitted & Code CompliantEmergency Service
What we do

Full ADU electrical for Livermore homes.

The electrical is what ties your new unit into the home's power safely and legally. Here is what we handle on an ADU, from the first load calculation to the final inspection.

01

Panel Upgrades for Your ADU Load

A new ADU can push an older 100-amp panel past its limit. We run the load calculation, upgrade the main service to 200 amps where it is needed, and leave both the house and the new unit with room to spare. See our residential electrical work.

  • 100-amp to 200-amp upgrades
  • Full load calculations
  • New meter and service coordination
02

ADU Subpanel Installation

Your ADU gets its own subpanel fed off the main service, so the unit has dedicated power and its own breakers. We size it to the real load, usually 125 amps for an all-electric unit, so nothing fights the main house for capacity.

  • 125-amp subpanels for all-electric ADUs
  • Sized to your appliances and HVAC
  • Dedicated feeds and grounding
03

ADU Wiring and Circuits

Kitchen, bath, laundry, HVAC, lighting, and outlets: we wire the whole unit to the California Electrical Code, with each circuit sized for what it actually runs. That is what keeps breakers from tripping once the ADU is lived in day to day.

  • Kitchen, bath, and laundry circuits
  • GFCI and AFCI protection
  • EV-ready and solar-ready rough-in
04

Permits and Inspection

ADU electrical has to be permitted and inspected in Livermore, and that is where a lot of projects stall. We pull the permit, build to code and Title 24, coordinate the PG&E connection, and stay on it through final inspection so sign-off is not the thing holding up your move-in.

  • Permit pulled and drawings reviewed
  • Title 24 and CEC compliance
  • Inspection scheduled and passed
Every kind of ADU

ADU electrical for every type of unit in Livermore.

Every ADU wires a little differently. Whether you are converting a garage or building new in the backyard, we handle the electrical that fits the unit and the way it ties into your home.

Detached ADUs & Backyard Cottages

A standalone backyard unit needs its own feeder run from the main service, often trenched underground to the ADU. We size the feeder and subpanel for a full detached accessory dwelling unit.

Garage Conversion ADUs

Converting a garage means bringing the existing circuits up to living-space code and adding the outlets, lighting, and dedicated circuits a home needs. One of the most common ADU electrical jobs we wire in Livermore.

Attached ADUs & In-Law Units

An attached unit ties into the existing house but still needs its own subpanel and its own circuits. We keep the two living spaces electrically separate, safe, and up to code.

Junior ADUs (JADUs)

A junior ADU built inside the existing home carries its own electrical requirements, even when it shares the main service. We wire the JADU to meet California's rules for the added kitchen and living space.

Not sure what your ADU panel needs?

We will run the load calculation and tell you straight, before you spend a dollar.

How it works

How we wire an ADU in Livermore, CA.

From the first plan review to power-up, here is how an ADU electrical project runs with us, so you know what happens and when.

01

Load Calculation & Plan Review

We review your ADU plans and run a load calculation on your existing service to see whether you need a panel upgrade, a new subpanel, or both.

02

Panel, Subpanel & Permit

We handle the panel upgrade or subpanel install and pull the electrical permit with the City of Livermore, drawn to the California Electrical Code and Title 24.

03

Rough-In Wiring

Once framing is ready, we run every circuit, outlet, switch, and fixture, plus any EV-ready or solar-ready conduit, then call for the rough inspection.

04

Final Inspection & Power-Up

After finishes, we set the devices, coordinate the utility connection, and see the unit through final inspection so your ADU powers up ready to live in.

Licensed electrician wiring an ADU subpanel in Livermore, CA
Why Golden

ADU electrical that passes inspection the first time.

Most ADU delays trace back to electrical that was not planned to code from the start. We scope the panel, the subpanel, and every circuit against the California Electrical Code and Livermore's rules before we pull a single wire, so there is nothing to fail when the inspector shows up. And while the walls are open, it is the cheapest time to rough in EV-ready and solar-ready wiring for later.

  • Licensed C-10 contractor, #1097977
  • Permits pulled and inspections passed
  • Subpanel sized to your plans, not a guess
  • Backed by our workmanship warranty
Get My ADU Wired Right
Questions

Frequently Asked Questions About ADU Electrical in Livermore, CA

Do I need a new panel for an ADU in Livermore?

Not always, but many Livermore homes with a 100-amp panel need an upgrade to safely carry an accessory dwelling unit. We check your existing service against the load of the new unit and tell you whether a panel upgrade or just a subpanel is the right call.

Does ADU electrical work in Livermore need a permit?

Yes. Electrical work for an ADU in Livermore requires a permit and an inspection. We pull the permit, build to the California Electrical Code and Title 24, and handle the inspection so your accessory dwelling unit is signed off properly.

What size subpanel does an ADU usually need?

A typical all-electric ADU runs on a 125-amp subpanel, though the right size depends on the unit's appliances, heating, and whether you want EV charging. As your ADU electrical contractor in Livermore, we size the subpanel to your actual plans.

Can you wire a garage conversion ADU in Livermore?

Yes. Garage conversions are one of the most common ADU projects we wire in Livermore. We bring the existing garage circuits up to code for living space and add the panel, outlets, lighting, and dedicated circuits the finished unit needs.

Do you work with my general contractor or ADU builder?

We do. Most of our Livermore ADU electrical jobs are coordinated with a homeowner's general contractor or ADU builder. We schedule the rough-in and final around the rest of the build so the electrical keeps the project moving.

Still have questions about your ADU wiring in Livermore? Call (855) 530-0002 or request a free quote.

Service area

ADU Electrical Service Areas in Livermore, CA

We handle ADU electrical throughout Livermore, including the 94550 and 94551 area, along with the nearby Tri-Valley communities of Pleasanton, Dublin, and San Ramon. Wherever you are adding a unit across the Tri-Valley, our licensed team can size and wire it right.

Livermore, CA Pleasanton, CA Dublin, CA San Ramon, CA
Get started

Ready to power your Livermore ADU?

Bring us your ADU plans, or just the idea, and we will tell you straight what the electrical needs, from the panel to the permit. Licensed, family-owned, and local to the Tri-Valley. Reach out for a complimentary consultation to get started.

☎ (855) 530-0002
Request My Quote